The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
ctcs-3 ji lie kong xi tong wu xian chao shi wen ti fen xi
Author(s): 
Pages: 28-32
Year: Issue:  4
Journal: Railway Signalling & Communication Engineering

Keyword:  CTCS-3 systemovertime in transmissionGSM-R network;
Abstract: GSM-R network is now widely used for train-ground information transmission in CTCS-3 systems. It is found that radio overtime is a kind of main problems affecting operational quality of the CTCS-3 system. The paper introduces the problem analysis idea and situation of the radio overtime problem and describes some typical problems found during the analysis, partial problems that have been solved, as well as some suspense problems need further study, which can provide reference for solve radio overtime problems in practical applications.
Related Articles
No related articles found