The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit
later.
We apologize for any inconvenience caused
zheng zhou bei bian zu zhan deng qiao kong zhi xi tong jie jue fang an
Author(s): ZHOU Jun
Pages: 52-
56
Year: 2015
Issue:
5
Journal: Railway Signalling & Communication Engineering
Keyword: marshalling station; bridge lamp; control; system;
Abstract: With implementing integrated automation system in Zhengzhou north marshalling station, all businesses of receiving, coupling, decoupling, marshalling and departure operation in six yards of the station are ifnished in a dispatching hall through centralized control and monitoring. There are some problems due to withdrawing personal responsible for managing bridge lamps in different yards, and power sources cannot be used unreasonably because of without switching off the power supplies on time. The paper introduces the system design of the bridge lamp control mode based on the current situation.
Citations
No citation found
Related Articles
No related articles found