Discussion on Headway at Dongguan Station of Guangzhou-Shenzhen Line 1 & 2
Author(s): 
Pages: 58-61
Year: Issue:  5
Journal: Railway Signalling & Communication Engineering

Keyword:  追踪间隔CTCS-2目标距离广深线;
Abstract: 针对广深线东莞站到达间隔时间为5.2min,是全线能力限制点的问题,探讨了三种缩短到达间隔时间的改进措施:单红灯防护方式、增设进路信号机和黄闪黄信号升级.