Application of Secondary Jet-grouted method on Jet-grouted Pile Construction in Sand Soil Stratum
Author(s): 
Pages: 61-62,86
Year: Issue:  1
Journal: Resources Environment & Engineering

Keyword:  二次旋喷旋喷桩冒浆负重;
Abstract: 在砂土地层中施工旋喷桩,地表冒浆量过大,浪费大量的水泥.通过在桩顶部预旋喷2 m,待预旋喷桩体凝固后,形成有效负重,再进行二次旋喷的方法,有效防止孔口大量冒浆.采用二次旋喷处理,既可保证施工质量,又可节约水泥用量,符合工程施工经济的要求.