The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Simulation of Bolt-up Process for Seal Main Bolts of PWR Pressure Vessel
Author(s): 
Pages: 13-15
Year: Issue:  6
Journal: Hydraulics Pneumatics & Seals

Keyword:  PWRpressure vesselsealmain boltsbolt-up;
Abstract: The reactor pressure vessel of self-owned pressure water reactor (PWR) is built, and the bolt-up process for main bolts is analyzed in this paper. According to the calculation, the change of the pre-load on the bolts and the deformation of the main flange can be checked, and a lot of useful conclusions can be got, such as whether the bolt-load of every step is good or not, whether the bolt groups are good or not. The simulation results of this paper are very meaningful for the bolt-up process operation of the first loop pressure vessel.
Related Articles
No related articles found