Generator circuit breaker(GCB) is wanted or not for unit 1 & unit 2 of Taishan Power Plant
Author(s): 
Pages: 19-22
Year: Issue:  6
Journal: GUANGDONG ELECTRIC POWER

Keyword:  GCB可用率技术分析经济比较;
Abstract: 通过分析GCB的作用、运行管理、经济性和制造水平,比较论证台山发电厂1号、2号进口机组(2×660 MW)是否采用发电机出口开关(GCB)的方案,且重点分析了GCB对600 MW级火电机组电气接线、控制、保护及运行管理的影响,提出了台山发电厂600 MW级火电机组采用GCB是可行的的观点 .