Boiler working performance analysis of second stage project in Zhanjiang Power Plant
Author(s): 
Pages: 26-29
Year: Issue:  6
Journal: GUANGDONG ELECTRIC POWER

Keyword:  锅炉性能试验运行性能;
Abstract: 为全面考核湛江发电厂二期工程2台机组锅炉的运行性能,对该工程的锅炉进行了达标性能试验.对锅炉的性能及其影响因素进行了分析,同时指出了锅炉在运行性能方面存在的问题,主要是主、再热蒸汽温度偏低,一、二次热风温度达不到设计值,炉膛出口烟温偏差较大.并对存在问题的原因进行了分析.