High fall laying of 252 kV XLPE cable
Author(s): 
Pages: 63-65,74
Year: Issue:  6
Journal: GUANGDONG ELECTRIC POWER

Keyword:  XLPE电缆高落差敷设;
Abstract: 要在福建棉花滩水电站108 m的竖井中垂直敷设高压交联聚乙烯(XLPE)电缆,需考虑电缆的径向机械受压、轴向受拉、电缆扭转、钢丝绳绑扎等问题,为此,对施工前出现的诸多问题进行分析并提出解决办法,重点介绍高落差电缆敷设的技术措施.施工的圆满完成,为同类型工程提供了经验借鉴.