Analysis of Ring Closing Test on 10 kV Distribution Network by Shenzhen Power Supply Bureau
Author(s): XIE Qingrui
Pages: 60-
62
Year: 2010
Issue:
3
Journal: Guangdong Electric Power
Abstract: 在介绍深圳供电局10 kV配电网合环操作试验的线路、接线方法和步骤的基础上,计算出合环稳态电流和合环冲击电流,并与基于数据采集与监视控制(supervisory control and data acquisition.SCADA)系统的配电网合环操作风险评估系统的计算结果相对比,得出配电网合环操作风险评估系统的计算结果具有较高准确性的结论,最后探讨开展配电网合环操作时应注意的问题.