Experimental Study of Air-Cooled Riprap Subgrade of Qinghai-Tibet Railway
Pages: 686-693
Year: Issue:  5
Journal: JOURNAL OF GLACIOLOGY AND GEOCRYOLOGY

Keyword:  青藏铁路片石气冷路基变形;
Abstract: 为确定青藏高原多年冻土区片石气冷路基修筑后温度场的变化过程,在青藏铁路清水河高温冻土细粒土段设计并开展了片石气冷路堤和普通路堤实体工程对比试验.基于两个测试断面的两个冻融循环的地温和变形监测资料,对比分析了片石气冷路堤与普通路堤的天然地面孔、左、右路肩孔的地温变化情况、温度场中最大融化深度的变化及路基的沉降变形情况.结果表明:片石气冷路堤体内地温寒季明显低于普通路堤段,利于积存冷量,其最大融化深度抬升幅度较大,该路基的沉降变形小于对比段.片石气冷路堤能够有效发挥降低地温、保护多年冻土的作用,是一种主动保护多年冻土的措施.