Feasibility study of sending power from Sichuan Power based on the Three Gorges'Grid
Author(s): 
Pages: 22-25
Year: Issue:  3
Journal: ELECTRIC POWER

Keyword:  水电通道三峡电力输送;
Abstract: 四川水电资源丰富,其开发需要与外送通道的建设协调进行,其中通过三峡输电系统外送是重要的通道之一.本文对通过三峡系统实施川电东送1 500~2000MW容量的可行性进行讨论,提出对三峡系统网络修改的建议.