discuss the reasons and countermeasure of progress rate out of control in construction project execution stage
Author(s): CHEN Jian
Pages: 33-
35
Year: 2004
Issue:
2
Journal: CONSTRUCTION & DESIGN FOR PROJECT
Keyword: 施工阶段; 进度失控; 原因; 对策;
Abstract: 建设项目施工阶段进度失控的原因主要是:业主的资金不到位、图纸不到位、甲供材不到位、工期确定不合理;承包商的资信和实力差;监理工程师控制能力差.对策是:业主做好项目建设的前期准备工作,把好招标投标关,选择有实力的设计单位、承包商、材料供应商和监理单位,严格执行合同规定.