Probing into the developing scheme of the Guangxi Longjiang Xiaqiao hydropower station
Author(s): 
Pages: 21-23
Year: Issue:  1
Journal: GX WATER RESOURCES & HYDROPOWER ENGINEERING

Keyword:  岩溶地质水电站开发设计;
Abstract: 根据下桥水电站的工程地质条件,对水库岩溶渗漏、坝基岩溶裂隙及软弱夹层分析,指出影响建库筑坝的不利因素,提出防渗和坝基处理意见,对各开发方案进行评价,择优选择.