Research on Transition Process of Water Diversion System of Luowan Hydropower Plant
Author(s): 
Pages: 70-71
Year: Issue:  5
Journal: CHINA RURAL WATER AND HYDROPOWER

Keyword:  水电站水轮机引水系统过渡过程;
Abstract: 为了对罗湾水电站增容前后的引水系统过渡过程和机组增容改造对引水系统建筑物的影响进行研究,应用水击计算方法中的电算法进行计算,得出了调压室最低、最高涌浪水位,蜗壳处最大压力水头和机组转速最大升高.结果表明,电站增容后引水系统完全能满足有关规范和设计的要求.