The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit
later.
We apologize for any inconvenience caused
Design of Exploiting Project of Groundwater Source Place in Fufeng County of Shaanxi Province
Author(s): WAN Weifeng, Li Yunfeng
Pages: 34-
38
Year: 2005
Issue:
1
Journal: GROUND WATER
Keyword: 陕西扶风县城; 地下水源; 开采方案;
Abstract: 针对严重缺水的陕西省扶风县城供水问题,本文在分析该区水文地质条件和开采现状的基础上,建立了水文地质概念模型,选择了承压水二维非稳定流数学模型进行描述,采用解析法无越流的无界承压含水层干扰井群法求解该数学模型,设计了两套地下水开采方案,计算评价水源地可开采资源量,并对两套方案的计算结果进行了讨论分析,建议选取第二套方案,布井19眼,设计开采量19500m3/d,为拟建城区水源地供水工程新增1.5万m3/d~1.9万m3/d可开采水量提供了依据.
Citations
System Exception