The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit
later.
We apologize for any inconvenience caused
Study on optimized operation of Cuijiaying navigation-power junction
Author(s): XU Junfeng, ZHAO Jinjing, LIU Juntao, PU Xiaogang
Pages: 604-
608
Year: 2016
Issue:
6
Journal: Journal of Waterway and Harbor
Keyword: navigation-power junction; shipping rate; guarantee rate of navigation stage; multi-objective sched-uling scheme;
Abstract: Reservoir scheduling is a complicated multi?objective optimization problem. Taking the maximum of power generation and reliability requirement or the minimum output of power plant as a single objective, the previ?ous studies were confined to power optimization, which can not satisfy the requirements of water supply, flood con?trol and shipping scheduling. According to the complex operation mode of Cuijiaying navigation?power junction ,two models were established in 2012 typical dry season. The models were solved by using dynamic programming algo?rithm, and the optimal solutions of the models were produced. A complete scheduling criterion was proposed for the first time. It has a significant meaning for actual operation of Cuijiaying navigation?power junction.
Citations
System Exception