The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Mechanism Analysis of the Second Lining Cracking in the Section from Yicheng to Baokang of Mazhu Expressway
Author(s): 
Pages: 770-775
Year: Issue:  5
Journal: Resources Environment & Engineering

Keyword:  expressway tunnelthe second lining crackingdefectanalyze;
Abstract: During the construction of expressway tunnels,cracking of supporting structure is a very common defect that happens at the initial lining stage which is relatively easy to be dealt with. Compared to the initial lining stage,cracking at the secondary lining stage though rare,it however happens for more complex reasons,is more difficult to deal with,and has a greater impact on the overall structural safety of tunnels during construction and later operation stage. Thus,in or-der to prevent the formation of cracks and provide some guidance to future construction project,it has significant value to investigate thoroughly on the characteristics and causes of the cracking happens at secondary lining stage. In this paper, the causes and counter measures of cracking during the secondary lining stage of one tunnel that are part of Mazhu expre-ssway ( Yicheng to Baokang) have been discussed in detail,which can be referred by other projects.
Related Articles
No related articles found