The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Review on Amendments of the Main Equipment Structure Design and Manufacturing Process of Qingyuan Pumped Storage Power Station
Author(s): 
Pages: 7-21
Year: Issue:  5
Journal: Dam Observation and Geotechnical Tests

Keyword:  head cover combined seamwater guide mechanismturbineinlet valve pivotthick annular plate magnetic yokepole core;
Abstract: In the process of Qingyuan pumped storage power station construction, this paper briefly introduces user’s proposed amendments of the main equipment design manufacture process, and the concrete implementation,with manufacturer sitfully embodies the style of the close cooperation and common improvement. The unit 1,2&3 of QPSPS have put into commercial operation, the unit performance index is excellent and the operation quality reaches a highly new level among the same type units at home and aboard.
Related Articles
No related articles found