Analysis on wave induced downtime in sea port design
Author(s): 
Pages: 11-14
Year: Issue:  6
Journal: China Harbour Engineering

Keyword:  downtimeship mooring studynumerical wave studyphysical wave studytime series;
Abstract: 以喀麦隆克里比深水港项目为例,提出了结合船舶系泊试验、实测资料及波浪传播模型,分析波浪引起船舶装卸不可作业时间的方法,并与国外的研究结论进行对比,一致性较好.同时指出了对于长周期波浪影响船舶装卸作业的分析方法,以及将不可作业时间转换为不可作业天数时的注意事项.可供相关设计参考.