The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Surface deformation prediction during pipe-jacking construction based on probability integral method
Author(s): 
Pages: 78-83
Year: Issue:  1
Journal: Hebei Journal of Industrial Science & Technology

Keyword:  underground constructionpipe-jackingsurface deformationprobability integral method;
Abstract: 为了预测顶管地表变形,分析顶管施工地层损失的原因,将概率积分法应用于顶管地表变形预测,在VC6.0下开发了相应的计算程序,可以给出顶管地表沉降、倾斜、曲率、水平变形、水平移动5种变形,以及绘制顶管地表变形的横断面图、平面等值线图和三维立体图.将该程序应用于广州某项管工程地表变形预测,与实测数据对比,验证了本文方法和程序的正确性,从而为顶管地表变形预测提供了一种新方法.
Related Articles
loading...