The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Research on the critical expansion length of large span continuous beam bridge for CRTS Ⅱ slab track
Author(s): 
Pages: 414-422
Year: Issue:  3
Journal: Journal of Changsha Railway University

Keyword:  railway engineeringCRTS Ⅱ slab trackconcrete underlayerlarge span continuous beam bridgeexpansion lengthlimit state method;
Abstract: Although the structure of large span concrete bridge is widely used in China high- speed railway,the critical expansion length of large span concrete bridge still remains uncertain during the design of CRTS Ⅱ slab track on bridge. The nonlinear spatial rail- slab- bridge- pier integrated mechanical model was established based on the characteristics of CRTS Ⅱ slab track on bridge. And the corresponding finite element model was established in finite element software ABAQUS. With the increasing of expansion length,the stress and deformation characteristics of the track structure were studied under different load cases. Both the design theory of CWR on bridge and limit state method were used to track structure check- calculation in force and deformation. The result shows that different track structure has different degrees of growth with the increasing of expansion length.Among the load cases,contractility caused by bridge temperature has a greater influence. When the expansion length reaches 496 m,the stress and deformation of the rail and track slab are not achieved the limitations,but the concrete underlayer has reached the serviceability limit state at this time. Therefore,it is suggested that the ultimate expansion length of the large span continuous beam bridge used for laying the CRTS Ⅱ slab track should not be greater than 496 m.
Related Articles
loading...