The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Comparison and Selection of Shield Tunnel Lining in the Auxiliary Project in Beijing for the South-to-North Water Transfer Project
Author(s): 
Pages: 96-98,102
Year: Issue:  12
Journal: Yellow River

Keyword:  South-to-North Water Transfer Projectwater transfer tunnelsingle liningdouble composite lining;
Abstract: By researching and investigating some typical project examples in the design of the Auxiliary Project in Beijing for the South-to-North Water Transfer Project, the applicable conditions, feature and construction period of shield tunnel was summarized.This contributed to selecting reasonable lining, ensuring project safety, economic rationality and assuring completion on schedule.After comparing several lining forms,the double composite lining with the shield tunnel lining outside and the reinforced concrete lining inside was chosen in the Auxiliary Project in Beijing for the South-to-North Water Transfer Project.
Related Articles
loading...