Analysis and discussion of operation of automatic equipment for unattended substation in Chenzhou power bureau
Author(s): 
Pages: 40-42
Year: Issue:  5
Journal: HUNAN ELECTRIC POWER

Keyword:  自动化设备变电站无人值班;
Abstract: 对郴州电业局无人值班变电站自动化设备运行中存在的主要问题进行了统计、分析,找出问题的根源,并结合变电站的实际情况,提出了一系列解决方案及改进建议,方案实施后取得了良好效果.