The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Practice of dredging kiln and eliminating blockage of suspended kiln in Baosteel
Author(s): 
Pages: 57-59
Year: Issue:  3
Journal: Research on Iron and Steel

Keyword:  suspended kilndredging kiln and eliminating blockagecalcinationsplash preventing;
Abstract: Because of the problem of internal structure,the blocking phenomenon often occurred in suspended kiln of Baosteel.The time of eliminating blockage was long,the blockage could not be eliminated entirely and the safety risk was big.A splashing preventer was designed and installed in blockage eliminating hole. The time of eliminating blockage was shortened from 5hto 2h.The splashing area was controlled in a semicircle which diameter was decreased from 6mto 0.5m.The safety coefficient of operation was increased greatly.
Related Articles
No related articles found