The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Analysis on the Risk Engineering Design of a Shield Interval
Author(s): 
Pages: 68-70
Year: Issue:  18
Journal: Value Engineering

Keyword:  shield intervalrisk engineering designunderneath pass Datang Stationnumerical simulationconstruction monitoring;
Abstract: This paper analyzes the risk engineering design of the shield interval of Shangyong Park Station~Datang Station, expounds the main design principle of risk engineering, puts forward the pertinence measures of the related specific risks. At the same time, this paper carries out the comparison analysis and numerical simulation of the risk engineering of Datang Station in down-traversing Metro Line 3 and puts forward the monitoring scheme of shield interval to monitor the construction influence and guide the construction.
Related Articles
loading...