Analysis on Double Load Rejection in One Tunnel of Jiangsu Yixing Pumped Storage Power Plant
Author(s): 
Pages: 49-51
Year: Issue:  1
Journal: Dam Observation and Geotechnical Tests

Keyword:  Double load rejection in one tunnelRegulation guarantee calculationTest procedure;
Abstract: The measuring point arrangement、procedure and results of double load rejection in one tunnel of Yixing Pumped Storage Power Plant are introduced.The test results are compared with regulation guarantee calculation.This study can provide references to the re-checking calculation of regulation guarantee and double load rejection in one tunnel of other pumped storage power plants.