The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
The Engineering Realization of Xiluodu-Xiangjiaba Cascade AGC
Author(s): 
Pages: 65-69
Year: Issue:  1
Journal: Dam Observation and Geotechnical Tests

Keyword:  cascade AGCload distributioncontrol modeoptimal controlvibration area;
Abstract: With the operation of Jinsha River Xiluodu,?and Xiangjiaba?hydropower station,cascade automatic generation control(AGC)plays more and more important in the realization of Xiluodu-Xiangjiaba cascade’s optimal dispatch and operation.This article starts with control mode and aim of cascade AGC,introduces control function,operation mode,optimal control and security strategy in detail,analyzes site debugging,which shows cascade AGC’s importance role in cascade optimal load distribution and high efficient operation,and it will also provide references for the designation and realization of cascade AGC.
Related Articles
No related articles found