The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Analysis on risk factors of Huanghua- Shijiazhuang Highway interflow connecting line
Author(s): 
Pages: 30-32
Year: Issue:  2
Journal: Highways & Transportation in Inner Mongolia

Keyword:  interflow connecting lineunfavorable geologyrisk factorsanalysis;
Abstract: East Cangzhou interflow connecting line of Huang- shi Highway is one of the main road in Bohai coastal region,located in Cangzhou economic development zone,project area is coastal shoal area,with poor geological conditions. Traffic volume is big,and has many overloaded trucks. Design stage,construction period and after operation all has certain risk factors,through the analysis of these risk factors,has drawn great attention of the construction unit,to avoid some of the major accidents.
Related Articles
No related articles found