The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Comparison Analysis of Groundsill Bearing Capacity a Power Plant Return to Work Before and After
Author(s): 
Pages: 164-174
Year: Issue:  z1
Journal: Electric Power Survey & Design

Keyword:  soil foundationbearing capacitycontrastcomparative analysisreinspection;
Abstract: a power plant foundation construction after due to downtime is longer, the bottom of foundation foundation soil after stress release, the rain soaked process, its mechanical properties will change to a certain extent, for the detection of foundation bearing capacity of foundation soil under thechanging situation, the use of drilling, comprehensive detection of standardpenetration test, static cone penetration test and soil test method. Through the test on the same foundation platform inside and outside the cap test data statistical analysis and comparison, the present stage of the foundation of each detection unit and the construction drawing of in situ test data statistical comparison, playing to the resumption of work before and after the change ofbearing capacity of foundation.
Related Articles
loading...