The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield
Author(s): 
Pages: 1143-1147
Year: Issue:  12
Journal: Tunnel Construction

Keyword:  shield-bored tunnelground surface settlementtheoretical analysisnumerical simulationfield validation;
Abstract: In this paper,the transverse ground surface settlement of DIK42 +660 cross-section of land section of Shiziyang tunnel induced by shield boring is calculated by means of Peck formula. The ground is numerically simulated by means of ANSYS finite element model,and the transverse ground surface settlement values are obtained from the numerical simulation results. The transverse ground surface settlement values obtained by means of theoretical analysis and numerical simulation respectively are estimated by means of comparing them with the measured values. The paper can provide reference for the prediction of ground surface settlement of shield-bored tunnel of similar projects in the future.
Related Articles
loading...