Calculation and Verification of 10 MWp Grid-connected BIPV Project in Hangzhou East Railway Station
Author(s): 
Pages: 17-22
Year: Issue:  11
Journal: Building Electricity

Keyword:  Hangzhou East Railway Stationbuilding integrated photovoltaic (BIPV)grid-connected PV generationestimate of generating capacitycalculation of voltage dropselection of cable cross-sectionshort-circuit calculationrelay protection setting;
Abstract: The grid-connected BIPV system is adopted for 10 MWp PV power generation demonstration project in Hangzhou East Railway Station to integrate the grid-connected PV power generation and the rail transportation buildings. In the paper, the calculation& verification and key issues in the design are discussed, including the estimate of generating capacity of PV power generation system, calculation of DC line voltage drop and system short circuit current, selection of cable cross-section and relay protection setting.