The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Construction Quality Control of Cast-in-place Concrete Hollow Floor with GBF Pipe
Author(s): 
Pages: 164-164
Year: Issue:  18
Journal: Urbanism and Architecture

Keyword:  cast-in-situ concreteGBF hol ow floorstructural measuresquality control;
Abstract: This paper according to the author's practices, co-mbined with an example of a GBF cast-in-situ hol ow floor engineering, with reference to the correlation datas, carries on the discussion to the cast-in-situ concrete hol ow floor with GBF pipe from the key point, technical construction measures, quality control, quality standards and so on.
Related Articles
No related articles found