DEM Method for Calculating the Earthwork Excavation and Backfilling Amount
Author(s): 
Pages: 187-187,207
Year: Issue:  18
Journal: Urbanism and Architecture

Keyword:  land developmentearthwork excavation and ba-ckfilling amount;
Abstract: How to calculate the excavation and fil volume of development plots is an important part of land leveling project work. This paper uses the method of DEM and TIN data generation to simulate the ups and downs of terrain, and based on it to estimate the excavation and fil ing amount in the process of land development, and analyzes its advantages with traditional scat er method to calculate the excavation and embankment volume.