The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
Automatic generation of buffer subsystem for setting calculation in large power system
Author(s): 
Pages: 110-115
Year: Issue:  7
Journal: Relay

Keyword:  setting calculationbuffer subsystemoperation modeweighted networkprotection coordination;
Abstract: It is time consuming to use the entire network to conduct setting calculation for local area. The way to narrow down the grid size for setting calculation becomes an important subject. Based on the complex network theory, the weighted power network model is formed. The buffer subsystem for setting calculation consists of the coordination region and constraint region. After determining the scope of setting calculation, we include the adjacent branches of boundaries and its end nodes in the coordination region according to remote backup protection. Furthermore, the shortest electrical path is used to determine the minimum ring network of boundaries and coordination branches. Meanwhile the substation scope is determined by the self-impedance variation rate of boundary nodes. The constraint region consists of the smallest ring structures and substation scope. Under these, the depth first search and backtracking technique are applied to form the buffer subsystem automatically.
Related Articles
No related articles found