The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit
later.
We apologize for any inconvenience caused
CONSTRUCTION METHOD FOR XIEJIADONG KARST CAVE INSIDE TUNNEL IN GUANGXI
Author(s): Luo Bin
Pages: 129-
133
Year: 2014
Issue:
3
Journal: Industrial Construction
Keyword: tunnel; huge karst cave; treatment;
Abstract: Combining with Guangxi Xiejiadong cave tunnel hydrogeology as well as the collapse of the karst cave in tunnel construction , it was introduces the tunnel karst cave “back fill excavation method” construction technique . Through the implementation of this technology , it had been effectively solved the problem of the unstable rock mass collapse, which explored a path for the construction of the large water-eroded cave tunnel .
Citations
No citation information