The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
ji yu mo hu ping pan he lcc de dian wang qiang xiu ping tai she ji
Author(s): 
Pages: 1827-1829
Year: Issue:  11
Journal: East China Electric Power

Keyword:  network equipment managementrush-repair platformfuzzy evaluation methodlife cycle cost(LCC);
Abstract: The rush-repair platform for power grid is designed in accordance with the principle of break-down maintenance.The platform attempts to meet the rush-repair schemes for various equipment faults,and prestores the schemes with lower LCC in the repository in case of rush repair.After the repair,the fuzzy evaluation method can be adopted to assess each scheme.By eliminating the poorly-evaluated schemes,the optimal scheme can be retained in the repository.
Related Articles
No related articles found