zong jie jing yan ying jie an zhuang xie zai qin shan er qi gong cheng bu ru xin li cheng zhi qian
Author(s): 
Pages: 33-34
Year: Issue:  5
Journal: ZHONGGUO HEGONGYE

Keyword:  秦山核电二期工程不符合项核电站安装联营公司设计院设备订货设计复查网络进度阶段;
Abstract: <正> 按照二级网络进度要求,秦山核电二期工程一号核岛土建阶段可望于11月15日如期完成,顺利进入安装阶段。该工程是我国自主设计、自主建造、外方提供咨询的第一座大中型商用核电站。正如一般事物的发展规律那样,我们也走了一段相当艰难的路程。