The server is under maintenance between 08:00 to 12:00 (GMT+08:00), and please visit later.
We apologize for any inconvenience caused
Login  | Sign Up  |  Oriprobe Inc. Feed
China/Asia On Demand
Journal Articles
Laws/Policies/Regulations
Companies/Products
Bookmark and Share
tian sheng qiao yi ji dian zhan da ba de an quan jian ce she ji he jian ce yi qi mai she
Author(s): 
Pages: 3-6
Year: Issue:  2
Journal: Dam Observation and Geotechnical Tests

Keyword:  Tianshengqiao-1 Dam safety monitoring design installation of instruments;
Abstract: The dam of TSQ-1 hydropower station is the highest concrete face rockfill dam (CFRD) under construction in China.This article briefly describes the dam safety monitoring designs,especially several characteristic items,such as hydrostatic settlement cells and horizontal displacement gauges,which measure the settlements and horizontal displacements in the rockfill,and the longest pipeline ever installed in rockfill dams throughout the world,which is up to 350 m in length.Four stages are described in dam safety monitoring design and implementation,and the work which needs to be done at each stage is also described.Four aspects of work which are needed for full implementation in CFRD of TSQ-1 hydropower station are introduced.
Related Articles
No related articles found