Solution about the Problems during Commissioning of 35 t/h Fluidized-Bed Boiler
Author(s): 
Pages: 22-23,30
Year: Issue:  2
Journal: GUANGXI ELECTRIC POWER TECHNOLOGY

Keyword:  循环流化床:锅炉调试运行;
Abstract: 针对两台额定出力为35t/h的低携带率循环流休床锅炉在启动调试中存在的点火困难、烟气发生器烧损、过热器超温等问题,进行了研究处理,保证了锅炉的稳定运行.