Reconstruction of Water Mains in West Sest Sea Breakwater Dam
Author(s): 
Pages: 85-86
Year: Issue:  2
Journal: WATER & WASTEWATER ENGINEERING

Keyword:  供水干管更换施工大堤连云港市;
Abstract: 连云港市拦海西大堤供水管材原为DN600水泥管,经海水长期浸,损坏严重。现改为DN400玻璃钢管,采用穿管施工方式,将原DN600水泥管保留作为保护套管。介绍了施工中应注意的问题。