The Feasibility and Advantage of Managing the 125MW Units Using 300MW Unit Mode
Author(s): 
Pages: 20-22
Year: Issue:  1
Journal: HUNAN ELECTRIC POWER

Keyword:  300 MW机组模式 管理 125 MW机组 可行性 先进性;
Abstract: 随着市场经济的不断发展,电力系统生产各部门也正走向市场,计划经济下的电力生产管理模式越来越不适应市场竞争的需要;株洲电厂提出并实施的按300MW机组模式来管理125 MW机组,经技术改造和人员培训,不但可行而且有效,实现了真正意义上的减员增效,增强了市场竞争的能力.