Construction of Chemical Water Treatment System of Khartoum Refinery in Sudan
Author(s): 
Pages: 63-66
Year: Issue:  10
Journal: WATER & WASTEWATER ENGINEERING

Keyword:  电站化水系统配合施工体会;
Abstract: 通过在苏丹喀土穆炼油厂自备电站的化水系统配合施工,解决施工过程中由于现场条件的变化(如气候炎热、依托条件差、到货设备与设计不符等)而必须进行的设计变更,使化水系统一次试车成功.