Analysis of Improving the Transmission Ability of Southern Xinjiang Power Grid
Author(s): 
Pages: 12-16
Year: Issue:  12
Journal: Electric Power Science and Engineering

Abstract: 为有效缓解南疆缺电局面,投运了750 kV巴吐二线,形成了一回750 kV、一回220 kV线路双通道与系统联络,但电网输电能力仍不能满足用电需求.针对新疆南部现有网架结构,对如何提高新疆南部电网受电能力的措施进行了分析讨论.通过对各种措施的比较,提出相对较优的措施.在保证电网安全的前提下,提高电网输电能力幅度达到20%,大大缓解了南部地区缺电局面,提高了经济效益,具有一定的可借鉴性和推广性.