Test Method in Artificial Dig-hole Pile Vertical Load Transfer Law
Author(s): Liu Shengwen
Pages: 170-
171
Year: 2011
Issue:
7
Journal: Chinese and Overseas Architecture
Abstract: 人工挖孔灌注桩具有单桩承载力高、施工速度快,造价低,施工时无噪音,无污染,适应性强的特点.其竖向荷载的传递机理直接影响其承载力和沉降的确定.本文介绍了两种用于测试人工挖孔灌注桩竖向荷载传递规律的试验方法<\'[1]>,对工程实践具有一定的指导意义.