PRELIMINARY TALKING ABOUT THE MODE OF PREPARING COMPLETE SETS OF MACHINERY FOR TUNNEL CONSTRUCTION
Author(s): 
Pages: 78-82
Year: Issue:  3
Journal: JOURNAL OF RAILWAY ENGINEERING SOCIETY

Keyword:  隧道施工机械配套模式;
Abstract: 本文通过对中铁二局集团公司多年来各类隧道施工机械配套方案的介绍,展示了不同特点的隧道所选用不同的机械设备配套方案,指出了不同方案的优点和难点,探讨解决的建议方法,供各隧道施工单位参考.