Analysis on Shield Tunneling beneath Existing Cut & Cover Tunnel
Author(s): 
Pages: 38-40,44,57
Year: Issue:  2
Journal: Underground Engineering and Tunnels

Keyword:  轨道交通 区间隧道 盾构法 下穿 明挖法 暗埋段 地层损失 数值分析;
Abstract: 结合上海轨道交通11号线北段二期工程(江边风井—济阳路站盾构法区间隧道),对该区间下穿济阳路站68、号联络线暗埋段结构的附加变形影响进行数值分析,为确定该区间隧道结构施工时的地层损失率设计控制指标提供参考和指导;经施工实测数据比较,验证计算结果的可靠性。