Control of temperature cracking in concrete crane beam anchored on rock of Xiluodu Hydropower Station in spring and summer
Author(s): 
Pages: 140-144
Year: Issue:  z1
Journal: Rock and Soil Mechanics

Abstract: 为了保证溪洛渡水电站地下厂房岩锚梁的结构安全,研究进一步采取综合温控措施防裂的有效性和合理性,通过对地下厂房岩壁吊车梁在春季和夏季施工进行三维仿真分析,得到温度场和应力场的分布及其随时间的变化规律并进行分析比较,同时分析了春夏两季裂缝产生的不同原因,为以后的裂缝处理提供了参考依据.