NUMERICAL SIMULATION STUDY ON RETROFITTING FLUE DUCT BEFORE THE MIST-ELIMINATOR IN FGD SYSTEM OF 600 MW UNIT IN GUOHUA DINGZHOU POWER PLANT
Author(s): 
Pages: 33-37,50
Year: Issue:  10
Journal: Thermal Power Generation

Keyword:  电厂600MW机组烟气湿法脱硫除雾器数值计算;
Abstract: 借助通用的CFD数值计算软件FLUENT,对国华定州电厂600 MW机组烟气脱硫系统除雾器前烟道流场进行模拟.数值分析结果表明,由于脱硫系统除雾器前烟道内导流板布置位置不合理等因素的影响,导致该区域流场分布不均匀.对除雾器前烟道内的导流板布置位置进行了数值计算,给出优化改造方案.运行情况表明,改造后除雾器的除雾效率有了较大的提高.