The foundation pit dewatering plan's optimization and its application of a Taiyuan power plant
Author(s): 
Pages: 752-756
Year: Issue:  S1
Journal: Geotechnical Investigation & Surveying

Keyword:  基坑 降水 渗透系数 抽水试验 影响半径 回灌。;
Abstract: 基坑降水过程中由于多采用经验渗透系数,降水井布置不合理,直接影响基础及上部结构的施工。本文以太原市某电厂基坑降水为实例,通过抽水试验确定渗透系数,采用大口井方法确定基坑涌水量和基坑影响半径,制定合理的基坑降水及基坑支护和回灌技术方案,并推广该技术方案在在电力行业中的应用。