Optimization sequencing for grid construction projects based on evaluation of network coordination
Author(s): LI Canbing, FU Meiping, LIANG Jinzhao, DU Li
Pages: 112-
115,120
Year: 2010
Issue:
17
Journal: Relay
Abstract: 根据电网结构特点及各电压等级变电站的关联关系,提出网络协调程度评估模型,考查电网项目建设的紧迫性及技术标准的合理性,优化项目建设的顺序.进一步对电网建设项目进行经济评估,衡量项目的效益并进行二次排序,通过可靠性和经济效益的综合分析,得出项目的最优建设顺序.评估模型和优化思路对电网项目建设投资决策和效益评估等,具有一定的参考价值.